Written for
Plant scheduling, supply-chain planning and formulation R&D at a specialty or bulk chemicals maker.
Industry 3
Plant scheduling, supply-chain planning and formulation R&D at a specialty or bulk chemicals maker.
Plant scheduling, supply-chain planning and formulation R&D at a specialty or bulk chemicals maker.
Which production plan to run this shift; which formulation to make next.
Scheduling in spreadsheets or a legacy APS that takes hours to re-plan, so the plant runs yesterday’s plan.
When it goes wrong Every hour of re-planning is an hour of changeovers and due dates decided on stale data.
| Application | You give | You get | Status |
|---|---|---|---|
| Production scheduling across grades and changeovers Proof: 6 h → 1 min, across 100+ product grades, in daily use | Grades, due dates and capacity | A checked plan in minutes | Deployed through the platform network |
| Nesting and job-shop scheduling (sheet, batch, multi-machine) | Jobs, machines and sequences | The sequence and the nesting | Deployed through the platform network |
| Formulation and additive candidate ranking Proof: Four of four formulations ranked correctly on IBM Heron, materials lane | Candidate molecules | A ranked list with the gaps | Live on quantum hardware |
| Catalyst and process-chemistry screening | Candidate catalysts or intermediates | A ranking with binding and activation energies | Ready · computed, hardware next |
| Revenue management and order acceptance | Orders, margins and capacity | Which orders to accept | Deployed through the platform network |
| Predictive maintenance on cable and rotating assets Proof: Early warning on cable breaks moved from 2 days to 5–7 days | Sensor history | Earlier warning | Deployed through the platform network |
You send One week of plant data: grades, orders, changeovers, capacity.
You get back The re-plan and the comparison with your current plan. Two weeks.
Customer deployment · platform network
production schedule across 100+ product grades, recalculated in 1–10 minutes instead of 2–6 hours
Platform networkPlatform classical optimisation solvers, through our platform networkWhich production plan to run this shift
100+ product grades with changeovers, due dates and capacity, as a constrained scheduling model.
Published reference
No published production-scheduling result on quantum hardware at industrial scale; visible results are challenge prototypes.
Sources: arXiv:2411.10303
Merlin
6 h → 1 min across 100+ grades, in production (classical optimisation, platform network)
Platform networkBaseline
The plant's prior manual and spreadsheet planning

Chemicals · process manufacturing
A chemicals plant with more than a hundred product grades re-plans its production in one to ten minutes instead of two to six hours, in daily use. Delivered through our platform network with classical optimisation solvers.
Platform networkRead the story
Materials · chemicals, mobility, aerospace, pharma
The same measurement that ranked four photoresist formulations in the right order on a quantum processor applies to battery and lightweight materials, airframe and propulsion materials, formulation additives and excipients: candidates ranked with the energy gap each ranking rests on, before synthesis.
Measured on quantum hardwareClassical computationRead the storyClient anonymised to its sector; partner not named; metric quoted with its published baseline, compute type and status. Not our own measurement.
Chemicals / manufacturing
Planning time 2–6 h → 1–10 min, including verification
Through our platform network · partner and client not named
Your industry, next
A resist, a grid plan, a controller, a cipher: you get the answer, the method it was checked against, and its status. The free check runs in your browser.