Technology

How a resist ranking, a grid proof and a safety certificate are produced.

Hybrid by design: CPUs, GPUs and quantum processors, each used where the industry's problem needs it. The workflow below is told industry by industry; the methods themselves stay proprietary.

The workflow

From the fab's decision to a verdict the programme board can defend

1 · FrameThe decision and thecost of being wrong2 · FormulateModel, screen andclassical baseline3 · Run hybridCPU · GPU · QPU,each where it fits4 · VerdictAnswer, baseline,status, conditionsYour data stays in your perimeter · only abstracted circuit descriptions reach hardware providers

1 · Frame the decision

For a fab, the decision is which resist formulation goes forward and what a wrong choice costs in wafer time. For a utility, it is which expansion plan to commit capital to. We start from the decision, not the hardware.

2 · Formulate and screen

For a grid planner, the plan is held at its full degree instead of flattened into a penalty form, which is what lets the answer be proven rather than sampled. For a bank asking about portfolio optimisation, the screen says classical wins, and we stop. The free check runs this screen in about a second.

3 · Run hybrid

For the resist chemistry, CPUs give exact references wherever they can be reached, GPUs train and rank in minutes (a published 173 GPU-hours → minutes on one GPU), and the quantum processor runs only the part that is hard classically: the ranking that held on IBM Heron.

4 · Deliver the verdict with its evidence

For an autonomy team, the verdict is 95.6% safe episodes against 39.5% under white noise, with the baseline, the status (hardware input, simulation evaluation) and the conditions.

The compute stack

For the resist chemistry, each processor does what it is best at

CPUExact reference answers wherever they can be reached; sets up the problemGPUTrains and ranks; most of the compute bill lives here, in minutesQPURuns only the part that is hard classically

Sovereign and critical-infrastructure programmes: what stays in your perimeter

For a government or critical-infrastructure client, the heavy computation runs inside your network or on UAE-resident infrastructure, and the methods run on the 5–25-qubit machine a national programme has already installed. Only abstracted circuit descriptions reach hardware providers: no raw data, no labels, no business context.

Still from the Merlin Quantum film: transmission towers at dusk

What makes the results hold

Built for the machines a fab, a utility or a national programme can use today

Semiconductors: fixed-depth circuits

For the resist ranking, circuit depth stayed at three entangling layers at every width, which is why the ranking survived today's noise and why 126 qubits ran in a single run. Not noise-free: built to hold up under real noise.

Measured on quantum hardware

Sovereign programmes: readout that measures the machine

For a programme that owns its machine, our readout extracts the processor's own clock to 0.0029% and pinpoints which qubit is losing information, so the programme knows which part of the machine is failing a job.

Measured on quantum hardware

Materials chemistry: cleaner energies on the same chip

For the resist cluster, reading frequencies instead of averaging totals gave tighter energies than the standard estimator on the same chip and in the same run.

Measured on quantum hardware
Still from the Merlin Quantum film: an operations room
Still from the Merlin Quantum film: rack hardware close up

How an engagement runs

Readiness for the utility, a pilot for the fab, a programme for the sovereign buyer

Every step ends with something you can decide on. You can stop at any of them.

1ReadinessIs it quantum, classical or neither?2PilotYour data, your baseline, frozen protocol3ProgrammeInside your decision workflow

Step 1 · Weeks, not months

Readiness

For a utility: is the expansion plan a quantum problem, a classical one, or neither? A written verdict with its baseline, and a go / no-go for a pilot.

Step 2 · Your data, your baseline

Pilot

For a fab: your resist candidates ranked against the chemistry method you use today, with the baseline stated, an impact box with conditions, hardware chosen to fit.

Step 3 · Decisions on repeat

Programme

For a sovereign or critical-infrastructure programme: the methods join your workflow inside your perimeter, re-run as hardware improves, with UAE data residency and Arabic documentation.

Your industry, next

Bring us the decision your industry has to make next.

A resist, a grid plan, a controller, a cipher: you get the answer, the method it was checked against, and its status. The free check runs in your browser.

No keyNo cardAn answer in about a second