Industry 8

Security & critical infrastructure

The CISO office, the crypto-agility programme, resilience and continuity planning.

Written for

The CISO office, the crypto-agility programme, resilience and continuity planning.

The decision

Which cipher to migrate first and by when; which assets fail together under attack.

How it is done today

Inventories exist; dates do not; resilience is scored asset by asset.

When it goes wrong A migration without a date is a budget without a year; a blast radius scored one asset at a time misses what fails together.

Applications

ApplicationYou giveYou getStatus
Post-quantum migration planning

Proof: Central window 2030–31, range 2028–34

Your cipher inventoryA dated window per cipher and the migration orderAssessment
Correlated-failure and blast-radius analysisThe dependency graphWhat fails together across the estateMapped
QKD network designThe fibre map and the sitesWhere the QKD nodes goDeployed through the platform network
Network-traffic anomaly detectionTraffic recordsThe anomalous flowsDeployed through the platform network
Water and utility anomaly detectionSensor recordsThe anomaliesDeployed through the platform network
Key-size assuranceYour lattice parametersWhat they rest onAssessment

What changes for you

  • A dated window per cipher to budget against.
  • What fails together is read across the whole estate rather than scored one asset at a time.

First engagement

You send Your cipher inventory.

You get back The dated order. Two weeks.

Proof · Post-quantum migration planning

Readiness assessment

2030–31

central estimate of the risk window per cipher, range 2028–34, from published resource estimates

Our assessmentPlatform our dated assessment, not a measurement

Decision

Which cipher to migrate first, and by when

What is modelled

Per-cipher break timelines from published resource estimates, and the dependency graph of the assets that rely on each cipher.

Operational outcome

  • A dated risk window per cipher
  • A migration order across the estate
  • A budget timeline the board can plan against
Problem size
Every cipher in the estate · the asset dependency graph
Scope
A planning assessment; it informs the migration and does not perform it.

Results, each with its baseline

  • A dated risk window per cipher: central estimate 2030–31, range 2028–34. Baseline: published resource estimates and error-rate requirements.Our assessmentWhere our dated assessment
  • Which assets fail together under attack is simulated on the dependency graph; published search-based methods degrade from 0.983 at 10 qubits to 0.039 at 30.Classical computationWhere simulation

Benchmark

Security & critical infrastructurePost-quantum migration planning

Published reference

Lattice attacks on hardware run at dimension 7 against classical sieving beyond 180; the 2024 polynomial-time claim was withdrawn by its author.

Sources: arXiv:2006.14057 · arXiv:2604.27153

Merlin

A dated risk window per cipher, central 2030–31, range 2028–34

Our assessment

Baseline

Published resource estimates and error-rate requirements

Read the story

Your industry, next

Bring us the decision your industry has to make next.

A resist, a grid plan, a controller, a cipher: you get the answer, the method it was checked against, and its status. The free check runs in your browser.

No keyNo cardAn answer in about a second