Chemicals · process manufacturing

Production scheduling in minutes, not hours

A chemicals plant with more than a hundred product grades re-plans its production in one to ten minutes instead of two to six hours, in daily use. Delivered through our platform network with classical optimisation solvers.

Headline result

2–6 h → 1–10 min

one to ten minutes including the check of the plan, more than a hundred grades, in daily production use

Platform network
Still from the Merlin Quantum film: transmission towers at dusk
01 · The decision

The decision on the table

Rebuilding the production schedule across grades, changeovers, due dates and capacity took the planning team two to six hours in spreadsheets. By the time the plan was ready, the shift it was made for had moved on.

02 · What we did

What we did, with proprietary methods

The plant’s grades, changeover rules, orders and capacity were written as one constrained scheduling model and solved with the classical optimisation solvers in our platform network, with the check of the plan included in the run time. No quantum hardware was used, and the page says so.

03 · What it was worth

What it was worth

one to ten minutes including the check of the plan, more than a hundred grades, in daily production use

Key result · Chemicals · process manufacturing
Re-plan on demand, within the shift
Baseline
two to six hours of manual and spreadsheet planning
Condition
one to ten minutes including the check of the plan, more than a hundred grades, in daily production use
The plan is checked before it ships
Baseline
a plan trusted because there was no time to test it
Condition
the check runs inside the one-to-ten-minute window
Outcome

What happened next

For a client, the next step is the first engagement on this page’s industry: you send one week of plant data: grades, orders, changeovers, capacity. You get back the re-plan and the comparison with your current plan. Two weeks.

Decision it enabled

Re-plan on demand, within the shift

Instead of: two to six hours of manual and spreadsheet planning

Verified by · Delivered through our platform network; classical optimisation; in production use; quoted with its published conditions.

05 · How we know

How we know

  1. 01Planning time about 6 h → about 1 min as published; the customer interview gives the range 2–6 h → 1–10 min including the check of the plan. Baseline: the plant’s prior manual and spreadsheet planning.
  2. 02Classical optimisation solvers on the platform; no quantum hardware. In production use.
  3. 03Not claimed: any quantum contribution to this result, or that the figure transfers to a plant with a different grade structure.
StatusPlatform networkDelivered through our platform network; classical optimisation; in production use; quoted with its published conditions.

Your industry, next

Bring us the decision your industry has to make next.

A resist, a grid plan, a controller, a cipher: you get the answer, the method it was checked against, and its status. The free check runs in your browser.

No keyNo cardAn answer in about a second